Go Back   Pakistan Defence Forum > Pakistan Affairs > Economy & Development
Donate Pakistan Defence Every Month

Economy & Development Latest economy news updates and discussions. Discuss investments, finance, money making, stocks exchange of Pakistan.

Pakistan Defence Gallery
by Moin91
Member Galleries
by xtive
Exercises & Deployments
by QADRI
Rah-e-Nijat
by hassan1
JF-17/FC-1 Thunder
by khurram06
Hatf 3 (Ghaznavi)
by CaptainKidd
Exercises & Deployments

Advertisement Advertisement
Reply
 
LinkBack Thread Tools Display Modes
Old 05-31-2007, 11:16 AM   #1 (permalink)
Banned Members
 
MirBadshah's Avatar
 
Join Date: Apr 2007
Posts: 545   (View Stats)
Thanks: 0
Thanked 3 Times in 2 Posts
Not Ranked  0 score     
Arrow MWH to Provide Construction Management Services for Hydropower Project in Pakistan

MWH to Provide Construction Management Services for Hydropower Project in Pakistan


Wednesday May 30, 1:06 pm ET

Rapid Economic Growth Drives Demand for New Facility, Part of 25-Year Plan to Meet Increasing Demand for Energy


CHICAGO, May 30 /PRNewswire/ -- MWH, a global provider of environmental engineering, construction and strategic consulting services, has been selected by the Pakistan Water and Power Development Authority (WAPDA) to provide construction management and contract administration services on the Jinnah Hydropower Project (JHPP) through a joint venture with local engineering companies. The project, which broke ground in December 2006, and is scheduled to be completed by the end of 2010, is part of a 25-year master plan to meet increasing energy demand being driven by rapid economic growth in Pakistan.


In its role on the project, MWH will complete a detailed review of the JHPP engineering design and oversee procurement, construction, programming and quality assurance procedures. This includes quality control testing of construction materials and the final structures and components. In addition, MWH will monitor design and construction procedures to ensure they are completed correctly and comply with project specifications and local laws.

"MWH has a long history of working in Pakistan and with WAPDA," said Alan Krause, president of the Natural Resources, Infrastructure and Industry unit of MWH. "Working in strategic roles by contributing our technical expertise to hydropower projects, such as the Jinnah project, is among the things that MWH does best. We're pleased to have been selected and look forward to working with WAPDA to meet the engineering needs of this project."

Located in the Punjab province, 234 kilometers southeast of Islamabad, the main components of the JHPP include a headrace channel; a powerhouse that houses eight low head pit turbines each producing 12 megawatts of power for a total of 96 megawatts; a tailrace channel; a 132 kilovolt double circuit transmission line; and a 132 kilovolt switchyard. The annual 688 million kilowatt-hours of energy the hydropower facility is expected to produce will be transported along a five kilometer transmission line to provide power to the national electric grid system.

The project is being implemented under an EPC (engineer, procure, construct) contract awarded by WAPDA to Dongfang Electric Corporation, a Chinese contractor, for a total project cost of US $128 million.

http://biz.yahoo.com/prnews/070530/law103.html?.v=67
MirBadshah is offline   Reply With Quote
Sponsored Links
Reply

Bookmarks

Advertisement


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
ISI Pakistan Inter-Services Intelligence VisionHawk Strategic & Geopolitical Issues 47 12-29-2009 06:19 PM
Pakistan to end ceasefire, if WB construction not halted Owais Strategic & Geopolitical Issues 14 11-24-2006 09:22 PM
Lockheed Martin Upgrades Battle Management System Jana World Affairs 0 06-09-2006 09:47 PM
Pakistan-china begins construction of Chashma -2 VisionHawk WMD & Missiles 0 12-29-2005 04:05 PM


All times are GMT +6. The time now is 03:27 AM.
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.3.2