Russia Delays India’s 5th-Gen. Fighter Program

indian_foxhound

FULL MEMBER
Joined
Jan 10, 2013
Messages
1,827
Reaction score
0
According to news reports this week, the Indian Air Force (IAF) might have to wait longer before it can induct its first fifth-generation fighter aircraft (FGFA) after Russia, with which it is co-producing the platform, imposed delays and unexpectedly hiked development costs.

Despite the U.S. encouraging India to join the fifth-generation F-35 Joint Strike Fighter consortium, New Delhi committed itself to the Sukhoi/ Hindustan Aeronautics Limited (HAL) FGFA variant of the Sukhoi PAK FA PMF T-50, also known as the “perspective multi-role fighter.” The program was initiated during a visit to New Delhi by then Russian President Dmitry Medvedev in December 2010.

Under the two-decade, US$35 billion program — India’s largest single-item defense investment ever — the IAF was to receive three variants of the aircraft in 2014, 2017, and 2019, with the final version entering service from 2020 (since then induction has been pushed to 2022). The IAF intended to induct a total of 200 FGFAs — 166 single-seats and 44 twin-seats — but that number has since been trimmed down to 144 single seaters, ostensibly for financial considerations.

After initial joint development in Russia and the inking of a preliminary design contract, the final design and R&D contract was to be signed in 2012. However, The Times of India now reports, citing industry sources, that as a result of the additional costs and delays imposed by Moscow, there is little likelihood that the final design and R&D contract will be signed during FY 2013, or even in 2014, which will inevitably have implications for the consortium’s ability to deliver the first aircraft by 2022.

According to Russia’s Federal Service for Military-Technical Cooperation, the first Sukhoi/HAL prototype is now expected to appear sometime in 2015-2016, one to two years behind schedule.

The Russian Federation’s first T-50 prototype, which is intended to become the successor to the highly successful MiG-29 and Sukhoi-27, carried out its first test flight in early 2010, and its longest yet, covering a distance of 7,000km, in January this year. Sukhoi is also developing three other prototypes.

The IAF, which says it doesn’t have enough aircraft to meet its security requirements vis-à-vis Pakistan and China (it currently relies on 34 fighter squadrons), is also awaiting delivery of 115 Sukhoi-30MKI Flanker-Hair-dominance fighters — also a co-production effort between Sukhoi and HAL — from 2015, though that program also appears to be facing production delays.

Combat aircraft were the largest single component of Russia’s defense exports in 2012, accounting for 40 percent of its sales. With US$15.2 billion in arms exports in 2012, Russia is the world’s largest arms exporter after the U.S. India and China are among the largest recipients of Russian arms exports.

Russia Delays India
 
What the hell??

Russian makers are totally crap and don't know about the value of time. when US will have 6th generation plans then we will induct 5th gen planes. That's why Russian airforce always behind if we compare to US.
 
According to news reports this week, the Indian Air Force (IAF) might have to wait longer before it can induct its first fifth-generation fighter aircraft (FGFA) after Russia, with which it is co-producing the platform, imposed delays and unexpectedly hiked development costs.

Despite the U.S. encouraging India to join the fifth-generation F-35 Joint Strike Fighter consortium, New Delhi committed itself to the Sukhoi/ Hindustan Aeronautics Limited (HAL) FGFA variant of the Sukhoi PAK FA PMF T-50, also known as the “perspective multi-role fighter.” The program was initiated during a visit to New Delhi by then Russian President Dmitry Medvedev in December 2010.

Under the two-decade, US$35 billion program — India’s largest single-item defense investment ever — the IAF was to receive three variants of the aircraft in 2014, 2017, and 2019, with the final version entering service from 2020 (since then induction has been pushed to 2022). The IAF intended to induct a total of 200 FGFAs — 166 single-seats and 44 twin-seats — but that number has since been trimmed down to 144 single seaters, ostensibly for financial considerations.

After initial joint development in Russia and the inking of a preliminary design contract, the final design and R&D contract was to be signed in 2012. However, The Times of India now reports, citing industry sources, that as a result of the additional costs and delays imposed by Moscow, there is little likelihood that the final design and R&D contract will be signed during FY 2013, or even in 2014, which will inevitably have implications for the consortium’s ability to deliver the first aircraft by 2022.

According to Russia’s Federal Service for Military-Technical Cooperation, the first Sukhoi/HAL prototype is now expected to appear sometime in 2015-2016, one to two years behind schedule.

The Russian Federation’s first T-50 prototype, which is intended to become the successor to the highly successful MiG-29 and Sukhoi-27, carried out its first test flight in early 2010, and its longest yet, covering a distance of 7,000km, in January this year. Sukhoi is also developing three other prototypes.

The IAF, which says it doesn’t have enough aircraft to meet its security requirements vis-à-vis Pakistan and China (it currently relies on 34 fighter squadrons), is also awaiting delivery of 115 Sukhoi-30MKI Flanker-Hair-dominance fighters — also a co-production effort between Sukhoi and HAL — from 2015, though that program also appears to be facing production delays.

Combat aircraft were the largest single component of Russia’s defense exports in 2012, accounting for 40 percent of its sales. With US$15.2 billion in arms exports in 2012, Russia is the world’s largest arms exporter after the U.S. India and China are among the largest recipients of Russian arms exports.

Russia Delays India

Best time for Indonesia & Malaysia to join in Sukhoi or go for the MiG.....
 
According to news reports this week, the Indian Air Force (IAF) might have to wait longer before it can induct its first fifth-generation fighter aircraft (FGFA) after Russia, with which it is co-producing the platform, imposed delays and unexpectedly hiked development costs.

Despite the U.S. encouraging India to join the fifth-generation F-35 Joint Strike Fighter consortium, New Delhi committed itself to the Sukhoi/ Hindustan Aeronautics Limited (HAL) FGFA variant of the Sukhoi PAK FA PMF T-50, also known as the “perspective multi-role fighter.” The program was initiated during a visit to New Delhi by then Russian President Dmitry Medvedev in December 2010.

Under the two-decade, US$35 billion program — India’s largest single-item defense investment ever — the IAF was to receive three variants of the aircraft in 2014, 2017, and 2019, with the final version entering service from 2020 (since then induction has been pushed to 2022). The IAF intended to induct a total of 200 FGFAs — 166 single-seats and 44 twin-seats — but that number has since been trimmed down to 144 single seaters, ostensibly for financial considerations.

After initial joint development in Russia and the inking of a preliminary design contract, the final design and R&D contract was to be signed in 2012. However, The Times of India now reports, citing industry sources, that as a result of the additional costs and delays imposed by Moscow, there is little likelihood that the final design and R&D contract will be signed during FY 2013, or even in 2014, which will inevitably have implications for the consortium’s ability to deliver the first aircraft by 2022.

According to Russia’s Federal Service for Military-Technical Cooperation, the first Sukhoi/HAL prototype is now expected to appear sometime in 2015-2016, one to two years behind schedule.

The Russian Federation’s first T-50 prototype, which is intended to become the successor to the highly successful MiG-29 and Sukhoi-27, carried out its first test flight in early 2010, and its longest yet, covering a distance of 7,000km, in January this year. Sukhoi is also developing three other prototypes.

The IAF, which says it doesn’t have enough aircraft to meet its security requirements vis-à-vis Pakistan and China (it currently relies on 34 fighter squadrons), is also awaiting delivery of 115 Sukhoi-30MKI Flanker-Hair-dominance fighters — also a co-production effort between Sukhoi and HAL — from 2015, though that program also appears to be facing production delays.

Combat aircraft were the largest single component of Russia’s defense exports in 2012, accounting for 40 percent of its sales. With US$15.2 billion in arms exports in 2012, Russia is the world’s largest arms exporter after the U.S. India and China are among the largest recipients of Russian arms exports.

Russia Delays India



good job pakistan and isi
 
What the hell??

Russian makers are totally crap and don't know about the value of time. when US will have 6th generation plans then we will induct 5th gen planes. That's why Russian airforce always behind if we compare to US.

PAFFA will be inducted as we did with Su 30MK then retrofitted as FGFA till production line comes up. Anyway the "western" airforce has no decent 4.5 gen aircraft so we're fine there.
 
The author must have a look at F-35 program before making such comments. In complex projects like these some delay and cost escalation is invariably expected and even IAF is not hoping to get its hands on first prototype before 2015. Some patience would help here. I suppose as of now Rafale, LCA (& variants) and remaining Su 30 MKI are a priority for IAF, FGFA is still some distance away and there is no point in loosing our sleep over it.
 
According to news reports this week, the Indian Air Force (IAF) might have to wait longer before it can induct its first fifth-generation fighter aircraft (FGFA) after Russia, with which it is co-producing the platform, imposed delays and unexpectedly hiked development costs.

Despite the U.S. encouraging India to join the fifth-generation F-35 Joint Strike Fighter consortium, New Delhi committed itself to the Sukhoi/ Hindustan Aeronautics Limited (HAL) FGFA variant of the Sukhoi PAK FA PMF T-50, also known as the “perspective multi-role fighter.” The program was initiated during a visit to New Delhi by then Russian President Dmitry Medvedev in December 2010.

Under the two-decade, US$35 billion program — India’s largest single-item defense investment ever — the IAF was to receive three variants of the aircraft in 2014, 2017, and 2019, with the final version entering service from 2020 (since then induction has been pushed to 2022). The IAF intended to induct a total of 200 FGFAs — 166 single-seats and 44 twin-seats — but that number has since been trimmed down to 144 single seaters, ostensibly for financial considerations.

After initial joint development in Russia and the inking of a preliminary design contract, the final design and R&D contract was to be signed in 2012. However, The Times of India now reports, citing industry sources, that as a result of the additional costs and delays imposed by Moscow, there is little likelihood that the final design and R&D contract will be signed during FY 2013, or even in 2014, which will inevitably have implications for the consortium’s ability to deliver the first aircraft by 2022.

According to Russia’s Federal Service for Military-Technical Cooperation, the first Sukhoi/HAL prototype is now expected to appear sometime in 2015-2016, one to two years behind schedule.

The Russian Federation’s first T-50 prototype, which is intended to become the successor to the highly successful MiG-29 and Sukhoi-27, carried out its first test flight in early 2010, and its longest yet, covering a distance of 7,000km, in January this year. Sukhoi is also developing three other prototypes.

The IAF, which says it doesn’t have enough aircraft to meet its security requirements vis-à-vis Pakistan and China (it currently relies on 34 fighter squadrons), is also awaiting delivery of 115 Sukhoi-30MKI Flanker-Hair-dominance fighters — also a co-production effort between Sukhoi and HAL — from 2015, though that program also appears to be facing production delays.

Combat aircraft were the largest single component of Russia’s defense exports in 2012, accounting for 40 percent of its sales. With US$15.2 billion in arms exports in 2012, Russia is the world’s largest arms exporter after the U.S. India and China are among the largest recipients of Russian arms exports.

Russia Delays India

why ppl are posting these thing again and again there is nothing new in this article it's the copy paste of TOIelt's version and it clearly mentioned also in the above article,response to this development is also there in news

Google Translate

Russia and India are discussing the establishment of a fighter of the 5th generation without fail

15.07.2013 13:58 (Updated: 15.07.2013 15:45 ) 1423 4 0
A source close to the talks, said that deviations from the schedule of talks between Russia and India to create a fifth-generation fighter is not.
Основой для российско-индийского самолета послужит Т-50
© RIA Novosti. Alexei Druzhinin

MOSCOW, July 15 - RIA Novosti. No deviations from the schedule negotiations on a package of agreements associated with the joint production of a fifth generation fighter between Russia and India is not, told RIA Novosti on Monday, a source close to the negotiations.

On the eve of the Indian newspaper Times of India quoted a source in the Ministry of Defense reported that the signing of the contract for the development work on the Russian-Indian fifth-generation fighter (PMI / FGFA) is delayed because of the increased price of the project by the Russian side.

"This kind of publication associated exclusively political considerations rather than business. Project is profitable both countries, investment - 50 to 50, so any increase in prices and a slowdown in negotiations is not" - said the source.

Meanwhile, a source told the Indian edition, remains a very small chance that the contract for the work on the MIT will be signed in the fiscal years 2013-2014. According to him, the time frame will be revised, with the Defense Ministry set up a committee of experts, technicians and financial experts who will be engaged in checking the validity of value growth.

According to the newspaper, despite the delay in signing the contract with the Russian Federation, India still will not accept the U.S. proposal to buy the F-35 Lightning-II, since a large amount of money already invested in the project of MIT and India can not afford to maintain two similar programs, both from a financial point of view and from the point of view of the organization of technical support.

The agreement on the joint development and production of fifth generation fighter aircraft was signed on 18 October 2007 in Moscow. It is the largest joint project of Russian-Indian military-technical cooperation. In December 2010, FSUE "Rosoboronexport" company "Sukhoi" and Hindustan Aeronautics Limited (Hindustan Aeronautics Limited) signed a contract for the development of conceptual and technical design of aircraft.
 
IDRW. Digging out old TOI articles, adding salt & pepper and re-posting them for page value.
@indian_foxhound

Don't you know the matter was already discussed and RIAN has clarified that there was no
delay involved??

Is it necessary to post the same news from as many sources as you can find??
 
Last edited by a moderator:
It's okay.... LCA can be modified into a stealth fighter.... the most advanced in the world.... and carry Brahmos.... the most powerful missile in the world!
 
WTH is this
Such piece of great work must be shoved right into the Writers big,fat,hairy Bottom

On topic
Such projects take time & cost overruns are a part of it
 