Axa- FULL MEMBER Joined May 18, 2012 Messages 460 Reaction score 0 Nov 9, 2012 #1 It will take 30 months to complete and will cost 100M Aselsan and Gate Elektronic will provide electronic systems
It will take 30 months to complete and will cost 100M Aselsan and Gate Elektronic will provide electronic systems
revojam MEMBER Joined May 22, 2012 Messages 1,759 Reaction score 3 Country Location Nov 9, 2012 #2 For research purpose againts earthquakes right?
what SENIOR MEMBER Joined Dec 31, 2010 Messages 2,848 Reaction score 0 Country Location Nov 9, 2012 #3 No as far as I know this ship will localize places where there might be gas, drilling would be the next step. So far we're using foreign rented/leased ships in the Black Sea and the Mediterranean.
No as far as I know this ship will localize places where there might be gas, drilling would be the next step. So far we're using foreign rented/leased ships in the Black Sea and the Mediterranean.
atatwolf BANNED Joined Jul 15, 2012 Messages 6,965 Reaction score -19 Country Location Nov 9, 2012 #4 I like the name of the ship.